Sign In | Join Free | My howtoaddlikebutton.com
China Qingdao Xinguangzheng Husbandry Co.,  Ltd logo
Qingdao Xinguangzheng Husbandry Co., Ltd
Qingdao Xinguangzheng Husbandry Co., Ltd
Verified Supplier

2 Years

Home > Steel Structure Warehouse >

Hot Dip Galvanized Prefabricated Steel Structure Warehouse Whole House System Plant Building

Qingdao Xinguangzheng Husbandry Co., Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Hot Dip Galvanized Prefabricated Steel Structure Warehouse Whole House System Plant Building

  • 1
  • 2
  • 3

Brand Name : XGZ

Model Number : XGZ

Certification : GB, CE, ISO, TUA

Place of Origin : China Qingdao

MOQ : 100 square meter

Price : US $30-80 square meter

Payment Terms : L/C, T/T

Supply Ability : 5000 Ton Per Month

Delivery Time : 30 work days

Packaging Details : Standard Container

Bracing : Round Steel Tube

Column : Hot-Rolled Steel

Connection : Bolts Connection

Design Parameter : Wind Load, Snow Load and Earthquake

Main Steel Frame : H Steel,Z or C Purlin

Our Service : Design, Fabrication

Contact Now

Hot-dip Galvanized Steel Structure Whole House System Plant Building


Company Profile

Xinguang Zheng Group was established in 1997, after more than 20 years of steady development, it has now become a high-tech, diversified and export-oriented international private enterprise integrating research and development, design, production, installation and construction and service.

Hot Dip Galvanized Prefabricated Steel Structure Warehouse Whole House System Plant Building


Project Cases

Project Name: Zhongjie Era Overpass
Project Address: Qingdao, China
Project Brief Description:Zhongjie Era Overpass Project is Pingdu's first cross-street bridge project,
the whole project consists of three overpasses, the east side of the straight overpass bridge length
56.3 meters wide 5 meters, the west side of the straight overpass bridge length 49 meters wide 5
meters, the middle of the circular overpass main bridge diameter 56 meters, petal shape, the
narrowest 6.5 meters wide 12 meters.
Hot Dip Galvanized Prefabricated Steel Structure Warehouse Whole House System Plant Building
Project name:Guangming Conference Center of China Flower Expo
Project address:Shanghai, China
Project Brief Description: China Flower Expo Shanghai Guangming Convention Center project is
located in Dongfeng Farm, Chongming District, Shanghai, covering an area of about 2000 ㎡. It is a
steel and wood mixed structure. The main steel structure project is undertaken by XGZ, which adopts
pipe truss structure for production and installation. After the completion of the project, it will be used
to hold conferences and press conferences during the Expo.
Hot Dip Galvanized Prefabricated Steel Structure Warehouse Whole House System Plant Building
Project name: Audi Exhibition Hall in Uruguay
Project address:Montevideo, Uruguay
Project Brief Description: The project building area is 4,587 square meters. It contains exhibition hall and
workshop, and is the first Audi 4S shop in Montevideo, the frame of the exhibition hall part is truss
structure, while that of the workshop is portal steel frame. The wall enclosure is made of 100mm thick PU
composite panel and sandwich panel; the roof enclosure made of 100mm thick foam composite panel
(weight of foam 20kg).
Hot Dip Galvanized Prefabricated Steel Structure Warehouse Whole House System Plant Building
Project name:Testing Plant in Israel
Project address:Israel
Area:610 square meters
Completion time:the year of 2020
Application:Car testing center
This project adopts circle-castellated steel beams and square tube trusses,all structures were treated with
hot-dip galvanized.
Hot Dip Galvanized Prefabricated Steel Structure Warehouse Whole House System Plant Building

Customer Service

3D DESIGN 3-Dimensional Design
360 Degree All-side Display
SOLUTION Professional Project Analysis Engineer
Customized and Detailed Drawing
Thorough and Safe Erection Plan

Hot Dip Galvanized Prefabricated Steel Structure Warehouse Whole House System Plant Building

PRE-ASSEMBLING Production Pre-assembling
Connection Match Testing
Production Quality Guarantee

Hot Dip Galvanized Prefabricated Steel Structure Warehouse Whole House System Plant Building

PACKING Packing
Quality Guarantee
Reasonable Space Distribu

Hot Dip Galvanized Prefabricated Steel Structure Warehouse Whole House System Plant Building

OUR CLIENTS OVERSEA Sincere Smile
Thanksgiving Reception
Faithful Communication

Hot Dip Galvanized Prefabricated Steel Structure Warehouse Whole House System Plant Building


CHASING DREAMSCHASING DREAMS
WITH EACH PASSING DAYWITH EACH PASSING DAY

1997

-

2002

(2002) The first steel structure production line was completed and put into operation, and the company completed the transformation from steel trade to steel structure material production and trade
(2002) Qingdao Xinguangzheng Steel Structural Materials Co., Ltd. was established, which opened a new division in the history of Xinguangzheng development and opened a new milestone in the history of Xinguangzheng development
(2001) The first C-type steel production equipment was put into operation, and the production and processing scope continued to expand
(2000) The first composite plate production line was launched, and the processing scope was further expanded
(1997) The purchase of the first wave tile press marked the company's entry into the era of steel structure material processing from steel marketing; The company entered the era of steel structure material processing by steel consignment
(1997) Invested in the construction of the factory, Pingdu Guangzheng Industry and Trade Co., Ltd. was established

2003

-

2008

(2008) International business companies have been established, international business has entered a stage of rapid development, investment and construction of steel business has entered a stage of rapid development, investment and construction of a steel structure plant, while two steel structure production lines have been put into use, while two steel structure production lines have been put into use
(2006) Obtained the second-class qualification of steel structure construction
(2005) Completed the transformation from steel structure material trade to steel structure engineering transformation project
(2004) Invested in the construction of steel structure supporting plant area, specializing in the production of steel structure engineering maintenance materials
(2004) Obtained the Grade 3 qualification of steel structure construction
(2003) The construction of steel structure project started

2009

-

2013

(2013) Invested in the construction of the third steel structure plant, and built the container house production workshop in the same year
(2012) The company takes the management of PK work and profit amplification as the main line, and continues to deepen and improve the main line, continue to deepen and improve
(2011) Obtained the high-tech enterprise Certificate
(2010) Determine three strategic adjustments: talent structure, product structure, business structure three structural adjustments, marking the product structure, business structure three structural adjustments, marking the company began to enter the stage of standardized management
(2009) The company proposed strategic transformation: From management-oriented to management-oriented, from management-oriented to management-service-oriented, from management-oriented to management-service-oriented, from leader-driven development to leader-driven, employee transformation, from leader-driven development to leader-driven, employee driven development, to the leading product extension and bigger, do to promote development, Extend to the leading products and make them bigger, stronger, do fine transformation, do fine transformation

2013

-

2016

(2016) Obtained the Grade 3 qualification of general contracting for construction. The company established the strategy of "informatization" and "going out", and set up branches in Algeria and Ethiopia
(2015) Won the famous trademark of Shandong Province
(2014) Obtained the first-class qualification certification of professional contracting of steel structure engineering
(2013) Determined to take corporate financial data as management guidance and prepare for the listing of enterprises

2016

-

future

(2020) Enterprise platform, ecological chain and trust chain construction, self-fission system construction
(2019) India Joint venture was established
(2018) The "four new models" help the development of "steel structure +" : new products, new technologies, new models, and new formats
(2017) proposed to build the whole industrial chain based on "steel structure +"; Obtained the Ministry of Commerce and SASAC issued the enterprise credit evaluation AAA credit enterprises
(2016) contracted the construction of the new factory area of Levy and Joint-stock Company, laying a solid foundation for the development of the company's general contract project in the later stage
(2016.10) Obtained the qualification certificate of foreign contracted projects

Hot Dip Galvanized Prefabricated Steel Structure Warehouse Whole House System Plant Building


Product Tags:

Plant Building Prefabricated Steel Structure Warehouse

      

Hot Dip Galvanized prefabricated steel warehouse

      

Hot Dip Galvanized prefab steel warehouse

      
Wholesale Hot Dip Galvanized Prefabricated Steel Structure Warehouse Whole House System Plant Building from china suppliers

Hot Dip Galvanized Prefabricated Steel Structure Warehouse Whole House System Plant Building Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Qingdao Xinguangzheng Husbandry Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0